PYLONTECH
①Dip Switch: There are 4 Dip Switches that sets different baud rate and battery group address. If switch
position is turned to the "OFF" position, it means "0". If switch position is turned to the "ON" position, it means
"1".
Dip 1 is "ON" to represent the baud rate 9600.
Dip 2, 3 and 4 are reserved for battery group address.
Dip switch 2, 3 and 4 on master battery (first battery) are to set up or change the group address.
NOTE: "1" is upper position and "0" is bottom position.
Dip 1
Dip 2
0
1
1: RS485
baud
0
rate=9600
1
Restart to
take effect
0
1
NOTE: The maximum groups of lithium battery is 5 and for maximum number for each group, please check
with battery manufacturer.
4. Installation and Operation
LIO-4810-150A/ESS LIO-I 4810
After ID no. is assigned for each battery module, please set up LCD panel in inverter and install the wiring
connection as following steps.
Step 1: Use supplied RJ11 signal cable to connect into the extension port ( P1 or P2 ).
Dip 3
Dip 4
Group address
Single group only. It's required to set up master battery with this
0
0
setting and slave batteries are unrestricted.
Multiple group condition. It's required to set up master battery on the
0
0
first group with this setting and slave batteries are unrestricted.
Multiple group condition. It's required to set up master battery on the
1
0
second group with this setting and slave batteries are unrestricted.
Multiple group condition. It's required to set up master battery on the
1
0
third group with this setting and slave batteries are unrestricted.
Multiple group condition. It's required to set up master battery on the
0
1
fourth group with this setting and slave batteries are unrestricted.
Multiple group condition. It's required to set up master battery on the
0
1
fifth group with this setting and slave batteries are unrestricted.