Calendar Override; Regeneration Start Time - Pentair FLECK 2910 NXT Installer Manual

Hide thumbs Also See for FLECK 2910 NXT:
Table of Contents

Advertisement

6.4.13. Calendar override

Set the maximum number of days that the valve is in service without regenerating, regardless from
the volume of water used.
A
Note
For a timeclock valve, this value must be set. For metered valves, it is regenerated once the
amount of days is reached at a preset time unless the meter triggers regeneration before.
Calendar override initiate regeneration only if no regeneration has been initiated within the
delay programmed in calendar override parameter.
Z
Adjust the number of days with
AA Press
to validate the selection and advance to the next
parameter.

6.4.14. Regeneration start time

Set the time for regeneration start.
A
Mandatory
It must be set when the valve is in delayed mode or with a calendar override.
AB Adjust the time of regeneration with
AC Press
to validate the selection and advance to the next
parameter.
Ref. MKT-IM-002 / A - 18.11.2016
Installer Manual Fleck 2910 - NXT - Programming
,
and
.
,
and
.
Without calendar forcing
CALENDAR
OVERRIDE: ABSENT
Forcing every 3 days
CALENDAR
OVERRIDE: 03DAYS
Regeneration at 2:00 am
REGENERATION
TIME
02:00HR
Override every 3 days
CALENDAR
OVERRIDE:03 DAYS
57 / 98

Advertisement

Table of Contents
loading

Table of Contents