3. The flow rate demand decreased below the first trip point. The tank returns to standby.
Inlet
Valve
Tank
Flow rate demand
below first trip point
(Primary valve)
4. Total flow rate demand increased past a second trip point programmed rate. The second and
third tank (least volume remaining) changes from standby to service. The total flow is split
between three meters.
Inlet
Valve
Tank
Ref. MKT-IM-002 / A - 18.11.2016
Meter
Meter
Valve
Tank
Stand-By
Meter
Meter
Valve
Tank
Flow split between three meters
Installer Manual Fleck 2910 - NXT - Installation
Meter
Valve
Valve
Tank
Tank
Stand-By
Stand-By
Meter
Valve
Valve
Tank
Tank
Stand-By
Outlet
Meter
Outlet
Meter