Test Boiler; Burner Equipment - Riello 3898350 Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

4.8

Test boiler

The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram, consult the manufac-
turer.
4.9

Burner equipment

Gasket for gas train adaptor . . . . . . . . . . . . . . . . . . . . . . . . No. 1
M16x70 screws to fix the gas train adaptor . . . . . . . . . . . . No. 8
Thermal insulation screen . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
M18x70 screws to secure the burner flange to the boiler. . No. 4
Pressure switch (for leak detection control) . . . . . . . . . . . . No. 1
M16x67 stud bolts to fix the gas elbow to the pipe
coupling (for RS 650-800/EV BLU only) . . . . . . . . . . . . . . . No. 8
Cable grommets kit for optional electrical wiring input . . . . No. 1
M16 nuts to fix the gas elbow to the pipe coupling
(for RS 650-800/EV BLU only) . . . . . . . . . . . . . . . . . . . . . . No. 8
Spacers (Fig. 16 on page 20) . . . . . . . . . . . . . . . . . . . . . . . No. 2
Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Spare parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Technical description of the burner
11
GB
The firing rates were obtained in special test boilers, according to
EN 676 regulations.
In Fig. 3 you can see the diameter and length of the test combus-
tion chamber.
Example: RS 800/EV BLU
Output 7000 kW - diameter 120 cm - length 6 m.
D2448
Fig. 3
20041914

Advertisement

Table of Contents
loading

Table of Contents