Test boiler

The firing rates were obtained in special test boilers, according to
EN 676 standard.
In Fig. 3 you can see the diameter and length of the test
combustion chamber.
Example:
Output 407 kW (350 Mcal/h) - diameter 50 cm, length 1.5 m.
4.9

Commercial boilers

The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 3).
If the burner must be combined with a commercial boiler that has
not been EC approved (CE mark) and/or its combustion chamber
dimensions are clearly smaller than those indicated in diagram
(Fig. 3), consult the manufacturers.
In addition, for inversion boilers you are advised to check the
length of the combustion head, as indicated by the boiler
manufacturer.
4.10

Burner equipment

The burner is supplied complete with:
Gas train flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Gasket for gas train flange . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Thermal flange gasket . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Flange fixing screws M10 x 35. . . . . . . . . . . . . . . . . . . . . . No. 4
M12 x 35 screws to secure the burner
flange to the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 4
Cable grommets for the electrical wiring . . . . . . . . . . . . . . No. 5
Plug group for electrical wiring . . . . . . . . . . . . . . . . . . . . . . No. 1
Motor protection (with fixing screw) . . . . . . . . . . . . . . . . . . No. 5
Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Spare parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
20169372
Technical description of the burner
10
GB
Although combination is guaranteed when boiler has a CE type-
approval, preliminary tests are recommended for boilers or
furnaces having a combustion chamber size much different than
the one specified in Fig. 3.