3. Select OUTPUTS > EtherNet/IP > Simulation. Set the Simulation to on.
The controller starts sending simulation values to the PLC. The controller continuously sends a
simulation value in a loop from Minimum to Maximum during the set Period. When the value
gets the Maximum set value, it decreases to the minimum and then again to maximum. Error
and Status values set on the controller are also sent to the PLC.
4. Open or create a new project In the Studio 5000 Logix Designer environment.
5. Add the controller module. In the Controller organizer select I/O Configuration > Ethernet.
Right click on Ethernet and select New module.
A search window shows.
18 English