Commissioning; Overview: Commissioning - Daikin EHFZ03S18DJ3V Installer's Reference Manual

Hide thumbs Also See for EHFZ03S18DJ3V:
Table of Contents

Advertisement

11
|

Commissioning

11 Commissioning
In this chapter

11.1 Overview: Commissioning

Installer reference guide
158
INFORMATION
This unit is a heating only model. Therefore, all references to cooling in this
document are NOT applicable.
NOTICE
Make sure both air purge valves (one on the magnetic filter and one on the backup
heater) are open.
All automatic air purge valves MUST remain open after commissioning.
INFORMATION
Protective functions – "Installer-on-site mode". The software is equipped with
protective functions, such as room antifrost. The unit automatically runs these
functions when necessary. (If the user interface home pages are off, the unit will not
operate automatically.)
During installation or service this behaviour is undesired. Therefore, the protective
functions can be disabled:
At first power-on: The protective functions are disabled by default. After 36  h
they will be automatically enabled.
Afterwards: An installer can manually disable the protective functions by setting
[A.6.D]: Disable protections=On. After his work is done, he can enable the
protective functions by setting [A.6.D]: Disable protections=OFF.
11.1
Overview: Commissioning ...................................................................................................................................................... 158
11.2
Precautions when commissioning.......................................................................................................................................... 159
11.3
Checklist before commissioning............................................................................................................................................. 159
11.4
Checklist during commissioning ............................................................................................................................................. 160
11.4.1
To check the minimum flow rate........................................................................................................................... 160
11.4.2
Air purge function .................................................................................................................................................. 161
11.4.3
To perform a test run............................................................................................................................................. 162
11.4.4
To perform an actuator test run............................................................................................................................ 163
11.4.5
Underfloor heating screed dryout ......................................................................................................................... 163
This chapter describes what you have to do and know to commission the system
after it is installed and configured.
Typical workflow
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing an air purge.
3
Performing a test run for the system.
4
If necessary, performing a test run for one or more actuators.
5
If necessary, performing an underfloor heating screed dryout.
ERLA03DAV3 + EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1B – 2021.10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Altherma 3 r fErla03dav3Erla-dvEhfz-d3v

Table of Contents