Electrical installation
9.3.11 To connect the safety thermostat (normally closed contact)
Installer reference guide
106
A
B
A
B
a Installation of EKRP1AHTA is required.
3 Fix the cable with cable ties to the cable tie mountings.
1 Open the following (see
1 Top panel
2 Upper front panel
3 Upper switch box cover
Main zone
Wires: 2×0.75 mm²
—
2 Connect the safety thermostat (normally closed) cable to the appropriate
terminals as shown in the illustration below.
5
4
3
2
1
5
4
3
1 2
X801M
A8P
a
"7.2.4 To open the indoor
4
unit" [
55]):
1
3
2
ERLA03DAV3 + EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1B – 2021.10