Mounting On A Rack - ATTO Technology FibreBridge 2300E Installation And Operation Manual

Hide thumbs Also See for FibreBridge 2300E:
Table of Contents

Advertisement

Serial port
The RS-232 serial port provides support for remote
monitoring and management through a command line
interface, menu system or graphical interface (ATTO
Technology BridgeTools).
LED indicators
The LED indicators can be viewed from both the front
and the back of the FibreBridge 2300R/D.
Power: indicates if power is available from the
supply.
FC Activity: LED blinks to show activity on
the Fibre Channel port (numbered 0). During
very high activity, the LEDs appear to be
steadily lit.
2 gigabit operation: a lit LED indicates the
FibreBridge is using 2 gigabit.
SCSI 0 Activity, SCSI 1 Activity: each SCSI
bus has its own LED to show activity on that
bus (numbered 0 and 1).
Ready: should light after power has been
applied indicating the FibreBridge is ready to
operate.

Mounting on a rack

You may install "L" brackets so that either the
front or the connector side of the FibreBridge
2300 can be facing front. The mounting holes
Exhibit 4-2 Physical characteristics of the ATTO FibreBridge 2300R/D.
1 .72 inche s
(43.6 9 cm )
F ron t
C o nn ecto r side
Ready
P ower
Fibre Channel A ctivity
2 G B operation
L E D s
A ir vents
S C SI P ort 1
LE Ds
S C SI P ort 1
Fibre Channel A ctivity P ower
S C SI P ort 2
2 G B operation
E thernet port
S C SI P ort 2
Fibre Channel port
on the "L"-bracket fit a standard 19-inch rack
using a centered 1.25-inch (31.7 mm) hole
pattern.
The ATTO FibreBridge 2300R weighs about
10 pounds. Be careful when installing it a rack.
Always stack the rack from the bottom up to
ensure a stable and safe rack.
Minimum rack depth: 10 inches.
Make sure the power requirements of the
ATTO FibreBridge 2300R plus the cumulative
power draw of the other equipment in the rack
do not overload the supply circuit and/or
wiring of the rack.
Properly ground the FibreBridge 2300R to the
rack equipment. The earth ground connection
must be maintained when supply connection is
other than direct connection to the branch
circuit.
Install the FibreBridge horizontally within the
rack so it does not reduce the air flow within
the rack. The maximum ambient temperature
for the ATTO FibreBridge 2300R should not
exceed 50° C.
S C SI P ort 1
S C SI P ort 2
Ready
A ir vent
RS -232 port
C onn ector side
(s ee below for details)
P ower receptacle
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fibrebridge 2300rFibrebridge 2300d

Table of Contents