Procedure
1. Prepare the server for installation
2. Install the server. When seated properly, the server will be flush with the front of the chassis and the
release lever will close completely without resistance.
Installing a hot-plug drive
WARNING: To reduce the risk of injury from electric shock, do not install more than one drive carrier
at a time.
Procedure
1. Remove the drive blank.
2. Prepare the low-profile LFF hot-plug drive for installation.
Installing the chassis
31