Check Operation - Valor LX2 CORNER Installation Manual

Direct vent zero clearance gas fireplace, natural/propane gas
Table of Contents

Advertisement

Installation

Check Operation

Turn the fi replace fl ame up and down using the
remote control to confi rm that the full range of
inputs is achieved—see the remote control operation
instructions in Appendix.
Set Aeration (if necessary)
Light the fi re and allow the unit to warm up for 10–15
minutes to evaluate the fl ame picture. The burner is
equipped with an adjustable shutter to control primary
aeration. The shutter is factory-set to an aeration gap
which will give optimum performance for the vast
majority of installations.
Depending of fuel bed used, altitude and other
considerations, the fl ame picture may be improved by
adjusting the aeration. The need for adjustment should
be determined only by operating the appliance with the
fuel bed, liners and window installed and evaluating the
fl ame picture after a 15-minute warm-up.
Increasing aeration will cause the fl ames to appear
more transparent and blue showing more ceramic
eff ects glow.
Decreasing aeration will cause the fl ames to appear
more yellow or orange showing less ceramic eff ects
glow.
Too little aeration may result in black carbon forming
and dropping into the fi rebox.
56
To access the air shutter, remove the barrier screen and
the base plate. The air shutter lever is located in front
of the fi rebox behind the appliance front panel. Adjust
the shutter by using a screwdriver as a lever to slide the
shutter left or right.
Air Shutte r
Set air shutter with
a screwdriver
Close
Open
Check Operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

2200lkn2200rkn2200lkp2200rkp

Table of Contents