Installing The Bumper Spikes, Guide Bar And Chain; Installing The Bumper Spikes; Installing The Guide Bar And Chain - Fieldmann FZP 5216 B Manual

Hide thumbs Also See for FZP 5216 B:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

5. INSTALLING THE BUMPER SPIKES,

GUIDE BAR AND CHAIN
ATTENTION! Always wear protective gloves
when installing and inspecting the chain to prevent
injury from the sharp cutting edges on the chain.
Installing the bumper spikes
Using the included hex key and screws, attach the
bumper spikes, see picture (Fig. 2).

Installing the guide bar and chain

The safety brake lever (Fig. 1 point 9) must be
disengaged (pull it towards the top handle)
Loosen two nuts and take off the sprocket cover
(Fig. 3, point 2).
Seat the chain on to the guide bar and then thread
on to the sprocket (pinion). At the same time, hold
the chain on the guide bar.
ATTENTION! The chain tensioning pin
(Fig. 3, point 3) must fi t into the hole in the guide
bar (Fig. 3, point 4). The position of this pin can be
adjusted using the chain tensioning screw (Fig. 5)
ATTENTION! Ensure that the chain is always
correctly fi tted in the sprocket ring (Fig. 4). If this is
not the case, the chain saw may be damaged.
Put the sprocket cover back. Do not fully tighten the
screws, tighten by hand only, to make it possible to
tension the chain.
Tension the chain using the tensioning screw
(Fig. 5) and then tighten the sprocket cover nuts
using the included tubular wrench
ATTENTION! The chain is correctly tensioned if
it is possible to lift chain off the guide bar and its
height in the horizontal position in the middle of the
guide bar is 3 to 4 mm.
CHAIN SAW

Installing the bumper spikes, guide bar and chain

11
EN
Fig. 2
Fig. 3
Fig. 4
Fig. 5
USER'S MANUAL

Advertisement

Table of Contents
loading

Table of Contents