Index B400 Operating Instructions Manual page 78

Table of Contents

Advertisement

74
7. Measure belt tension (frequency meter) and adjust belt.
8. Replace Z8 belt.
9.
Example: Distance between deflection pulley and belt clamping
Measure belt tension (frequency meter) and adjust belt. Replace the Z8
workpiece removal unit belt. The value of 277mm listed in the table refers to the
distance between the center of the deflection pulley on the drive and the start of
the belt clamp (see example: distance between deflection pulley and belt
clamping). This value or distance is necessary to accurately adjust the belt
tension.
Maintenance Summary - 4.000 Operating hours
Maintenance Instructions
B400 B500
DIE150EN - 15.08.2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

B500

Table of Contents