Fujitsu PRIMERGY CX2550 M2 Upgrade And Maintenance Manual page 194

Table of Contents

Advertisement

Liquid cooling
Figure 88: Installing the flexible tubes (A)
Ê Push the flexible tubes through the holes of the liquid cooling kit riser module
(see arrow).
Figure 89: Installing the flexible tubes (B)
Ê Fasten the screws of the bracket.
194
Upgrade and Maintenance Manual
CX2550 M2

Advertisement

Table of Contents
loading

Table of Contents