www.ti.com
3
Performance Data
Figure 2
and
Figure 3
Figure 6
for transient response waveforms (25% to 75% load step) associated with each EVM. The default
output capacitance configured on the EVM is optimized for an output voltage of 5.0 V and 3.3 V. The
additional output capacitor footprints, C7, C8, and C11, are available on the EVM if an improved load
transient response or output voltage ripple is needed. See the
Output, 4-A Power Module Data
Module Data
Sheet, or
Sheet
for more information on the respective devices.
V
IN
EN
V
OUT
PGOOD
Figure 2. ENABLE Start-Up Waveform
V
OUT
I
OUT
Figure 4. TPSM53604EVM Transient Performance
SNVU627B – November 2019 – Revised December 2019
Submit Documentation Feedback
demonstrate the enable ON/OFF performance of the EVM. See
Sheet,
TPSM53603 3.8-V to 36-V Input, 1-V to 6-V Output, 3-A Power
TPSM53602, 3.8 V to 36 V Input, 1 V to 6 V Output, 2-A Power Module Data
V
OUT
I
OUT
Figure 6. TPSM53602EVM Transient Performance
Using the TPSM53604EVM, TPSM53603EVM, and TPSM53602EVM
Copyright © 2019, Texas Instruments Incorporated
TPSM53604 3.8-V to 36-V Input, 1-V to 7-V
Figure 3. ENABLE Shutdown Waveform
V
OUT
I
OUT
Figure 5. TPSM53603EVM Transient Performance
Performance Data
Figure 4
through
V
IN
EN
V
OUT
PGOOD
5
Need help?
Do you have a question about the TPSM53604EVM and is the answer not in the manual?