Commissioning; Unpacking (Large Construction); Unpacking (Large And Small Construction); Checking The Original Dimensions - KERN HTS Series Operating Instructions Manual

Electronic crane scale
Table of Contents

Advertisement

5.

Commissioning

5.1

Unpacking (large construction)

CAUTION
5.2

Unpacking (large and small construction)

Ensure that the all parts are accounted for.
• Crane scale
• Battery charger
• Remote control
• Operating Instructions
5.3

Checking the original dimensions

Carry out all safety checks, see chapter 10.1 "Regular maintenance after 3 months
of operation".
Enter all information (date, examiner, results) in the first line under "Checking before
first use" on the checklist (see chapter 10.2)
If the dimensions of your first safety check do not match those of the manufacturer,
then the scale must not be used. In this situation, contact a service partner
authorised by KERN.
HTS-BA-e-1024
Risk of straining your back!
The crane scale is compact and relatively heavy.
Remove the scale from the shipping container only
with assistance of another person.
Use a power-lifting device such as a crane or
forklift.
Secure the scale to ensure it doesn't drop when
lifting.
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hts150k 50ipHts300k 100ipHts600k 200ipHts1.5t 0.5ip

Table of Contents