Assembly, Installation And Commissioning; Unpacking And Check; Scope Of Delivery; Original Dimensions - KERN CH Operating Instructions Manual

Electronic suspended balance
Hide thumbs Also See for CH:
Table of Contents

Advertisement

Assembly, Installation and Commissioning

6
Assembly, Installation and Commissioning
6.1

Unpacking and check

For returning, please refer to the instructions in chapter "Return transport"
Remove all parts of the scope of delivery from the packaging and put aside the
packaging material. Then check if all parts of the scope of delivery are present and
free of damage.
6.2

Scope of delivery

• Balance
• Battery
• Operating instructions / logbook
6.3

Original dimensions

Prior to commissioning, check the dimensions according to the „Drawings for
maintenance" in the appendix. Enter the measured dimensions in the checklist
„Regular maintenance" in the appendix. To check the dimensions, use always the
same measuring principle and suitable test equipment.
20 | en
INFORMATION
CH-BA-e-2440

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch 15k20Ch 50k50Ch 50k100

Table of Contents