SETUP
[Status/Fault]
06 PT Setup
P
P
R
R
R

Figure 10-7, PT Charge Controller SETUP Menu Map

© 2021 Magnum Energy, Inc.
Using a PT Controller: Operation/Monitoring
06A Battery Type
P
Flooded
Set Float
P
Volts =
13.2
R
12.0 – 16.6 VDC
Set EQ
P
Volts =
15.6
R
12.0 – 16.6 VDC
Set CV Chg Done
Set CV Charge
P
Time
Volts =
R
Hold CV Chg VDC
Amps
P
P
Set CV Chg Done
Amps =
20 ADC
R
P
0-250 ADC
Set Max CC/CV
Time = 12.0 Hrs
R
0.1-25.5 Hrs
06B Absorb Done
Time =
2.0 Hrs
P
Set Absorb Done
Time
R
Set Absorb Done
Amps
R
Set Absorb Done
SOC
06C Max Charge
Set Max Charge
P
Rate =
100%
Rate =
Set Max Charge
06D Max Charge
P
Time = 12.0 Hrs
Time = 12.0 Hrs
SETUP button menu map continues on next page
Set Battery Type
GEL, AGM1, AGM2,
R
Flooded
Custom, CC/CV
Set Absorb
Volts =
14.4
R
12.0 – 16.6 VDC
Set EQ Done
Time =
4.0 Hrs
R
0.1 – 25.5 Hrs
Set Max Charge
P
13.8
Amps =
R
12.0-16.6 VDC
OFF, 20-990 ADC
Set CV Chg Done
Time =
2.0 Hrs
R
0.1-25.5 Hrs
Set Recharge
P
Volts =
R
9.0-16.0 VDC
Set Absorb Done
P
Time =
2.0 Hrs
Set Absorb Done
P
Amps =
20 ADC
Set Absorb Done
P
SOC
=
100%
R
0%-100%
100%
R
OFF, 0.1-25.5 Hrs
P
P
200 ADC
R
12.0
0.1-25.5 Hrs
R
R
0-250 ADC
R
50%-100%
Page 120