OPM223/253
3.2
• Make sure the packaging is undamaged!
Inform the supplier about damage to the packaging.
Keep the damaged packaging until the matter has been settled.
• Make sure the contents are undamaged!
Inform the supplier about damage to the delivery contents.
Keep the damaged products until the matter has been settled.
• Check that the scope of delivery is complete and agrees with your order and the
shipping documents.
• The packaging material used to store or to transport the product must provide shock
protection and humidity protection. The original packaging offers the best protection. Also,
keep to the approved ambient conditions (see "Technical data").
• If you have any questions, please contact your supplier or your sales centre responsible.
3.3
3.3.1
Fig. 2:
!
Note!
There is a hole in the punching for the cable entry (connection of supply voltage). It serves as
a pressure balance during air freight dispatching. Make sure no moisture penetrates the inside
of the housing before the cable installation. The housing is completely air-tight after the cable
installation.
Incoming acceptance, transport, storage
Installation conditions
Field instrument
Pg 13.5
Pg 7
Pg 16
REL 1
ALARM
REL 2
CAL
REL
REL 1
E
REL 2
Field instrument
11/
0.43
115 / 4.53
Installation
70 / 2.76
154 / 6.06
170 / 6.69
mm / inch
C07-OxM253xx-06-06-00-en-001.EPS
9