Post-Installation Check - OEM OPM223 Operating Instructions Manual

Transmitter for ph and orp
Table of Contents

Advertisement

Installation
3.4.2
The panel-mounted instrument is secured with the clamping screws supplied (see Fig. 8).
The necessary installation depth is approx. 165 mm (6.50").
approx. 25 /
Fig. 8:
1
Wall of the cabinet
2
Seal
3
Clamping screws
*
Required installation depth
3.5
• After installation, check the transmitter for damage.
• Check whether the transmitter is protected against moisture and direct sunlight.
14
Panel-mounted instrument
+0.5
+0.02
92
/ 3.62
3
139 / 5.47
0.98
approx. 165 / 6.50*
Securing the panel-mounted instrument

Post-installation check

1
2
3
max. 45 /
1.77
6 /
0.24
OPM223/253
3
C07-OxM223xx-11-06-00-en-001.eps