Connecting Power Cables And Powering On; Available Software Images; Initial Configuration - Check Point UTM-1 U-5 Getting Started Manual

Table of Contents

Advertisement

Configuring UTM-1

Connecting Power Cables and Powering On

For UTM-1 130
1. Connect the power cable to power supply unit.
2. Connect the power supply unit to the power port at the rear of the appliance.
3. Connect the power cable to an A/C outlet.
UTM-1 turns on immediately.
For all other UTM-1 models
1. Connect the power cable.
2. On the back panel, turn on the Power button to start the appliance.

Available Software Images

UTM-1 comes with multiple software images. Select the software image that you want to use.
Reverting to a software image takes a few minutes. To follow the progress and see when the
appliance is ready, connect to the appliance using a serial console.
For more about software images, see the UTM-1 Image Management Guide for the applicable
version (http://support.checkpoint.com).
Note - Gaia is available for R75.40 and higher.

Initial Configuration

Do the initial configuration of the appliance with the First Time Configuration Wizard.
There are different First Time Configuration Wizard options for the Gaia and the
SecurePlatform operating system.
14 | UTM-1 Getting Started Guide

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UTM-1 U-5 and is the answer not in the manual?

This manual is also suitable for:

Utm-1 u-10Utm-1 u-15Utm-1 u-20Utm-1 u-30Utm-1 u-40

Table of Contents