Maintenance Schedule - Wallenstein WXR700 Series Operator's Manual

Table of Contents

Advertisement

WXR720/L, WXR740/L
Log Splitter

9.3 Maintenance Schedule

IMPORTANT! For chain saw maintenance requirements,
see the chain saw manufacturer's manual.
IMPORTANT! For more information, see the engine
manufacturer's manual.
Complete maintenance tasks at the specified time or hour
interval, whichever comes first.
Task
Check the condition of all
hydraulic lines, hoses and
fittings.
Remove any entangled
material from splitter.
Check that all fasteners are
tight.
Check the engine oil level.
Check the fuel level.
Clean around the muffler and
controls.
Check the hydraulic fluid
level.
Inspect the hydraulic fluid
quality.
Grease the frame slide,
hinges, and pivot points.
Grease the axle bearings.
Check the tire pressure.
Change the hydraulic fluid
and filter.
Clean the machine.
Service the exhaust system.
Clean the engine air filter
.
2
Change the engine oil.
Replace the engine spark
plug.
Service the engine cooling
system.
Service the engine fuel
system.
Change the engine air filter.
1
N/A indicates that a reference is not applicable
2
In dusty conditions or when airborne debris is present, clean more often.
40
As
8 hours
hours or
required
or daily
annually
100
200
hours or
hours or
annually
annually
Annually
35
Service and Maintenance
600 hours
or every
three years Reference
N/A
1
N/A
N/A
See page 24.
See page 25.
N/A
See page 25.
See page 25.
See page 36.
See page 36.
See the tire
sidewall.
See page 37.
N/A
See the engine
manual.
See page 38.
See the engine
manual.
See the engine
manual.
See the engine
manual.
See the engine
manual.
See page 38.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wxr720Wxr740Wxr720lWxr740l11002341100217

Table of Contents