MSA M1 Modular SCBA System Cleaning And Disinfection Manual page 21

Hide thumbs Also See for M1 Modular SCBA System:
Table of Contents

Advertisement

Important Information for Cleaning and Disinfecting of Facepieces with Miele* Washing Extractor
Preparation
Loading
Concentration/Duration
Washing program
Removal
Drying
Post-treatment
NOTE:
* Types: PW 6163, PW 6243, PW 6323, PW 6247, PW 6327, PWM 909, PWM 912, PWM 916, PWM 920
GB
See
4.3 Preparation of Equipment
1. Place the disassembled facepieces in the protective bag for washing and close the
protective bag.
2. Place the respective small components into a separate container (e.g. additional
bag) or wash it separately.
3. Place facepieces loosely in the washing drum, do not squeeze.
• According to the requirements of the detergent manufacturer the detergent will be
dosed manually for Eltra
• 1% solution with Sekumatic
minutes at 60 °C, for every cleaning and disinfecting stage of the washing
program.
• The dosage is carried out automatically through a dosing station (optional
accessory) into the machine in exactly the required amount (as a liquid).
Miele special washing program for facepieces:
1. Pre-wash at 30 °C for 10 minutes (for heavily soiled facepieces only)
2. Cleaning and disinfection at 60 °C for 20 minutes with Ecolab Eltra
3. Purging cold for 8 minutes
4. Purging cold for 8 minutes
5. Purging cold for 8 minutes
6. Purging cold for 8 minutes
1. Open the chamber door once the washing program is finished.
2. Take out the facepiece bag, remove the facepiece and shake water residues out of
the facepieces after removal.
3. Close door of the chamber.
Dry facepieces at max. 60 °C.
If applicable remove detergent residues.
• Follow the instructions in the operating manual and safety data sheets of the
cleaning and disinfection detergent: Sekumatic
• Follow the correct adjustment of the dosage systems according to the detergent
manufacturer.
• Follow the instructions in the operating manual of the Miele washing machine.
• Follow the instructions in the operating manual of the facepiece.
• Perform a functional check, visual check and leak test on each facepiece after
reassembly.
• Check facepiece and components, especially the valves and valve seats for
detergent residue and if necessary, rework affected parts.
• After each cleaning and disinfection, the facepiece and components must be
checked for material changes. If necessary, affected parts must be replaced.
®
and automatically for Sekumatic
®
FDR: Application time 5 minutes at 60 °C or 5 - 8
®
FDR
4 Disinfection
®
FDR.
®
21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M1 Modular SCBA System and is the answer not in the manual?

Table of Contents