Free2Move eSolutions eProWallbox Installation Manual page 24

Hide thumbs Also See for eProWallbox:
Table of Contents

Advertisement

2.9.
Connectin communication cables
eProWallbox is e uipped with the ollowing ommuni ation eatures:
1. 2x RS485
2. RFID
3. BLE
4. Wi-Fi
5. 4G/LTE
To onne t external devi es to the wallbox through the RS485 ommuni ation ports, su h as MID
erti ed energy meters or billing pourposes or to enable additional un tionalities like HEMS,
or Dynami Power Management using the Power Meter, ollow the steps below and re er to the
dedi ated installation manuals available on the website
www.esolutions.free2move.com/document-library/
1.
emove the rotective ca
device, loosen it and insert the corrugated sheath Ø 25 mm.
2.
Insert the communication cable, pulling to a length that reaches the corresponding
communication port leaving some slack.
oles t at are not used must be closed usin t e protective caps provided to ensure
t e IP ratin .
To perform a state-of-t e-art installation, t e communication cables must pass
t rou
t e dedicated metal conduit inside t e wallbox.
3.
Insert the desired connectors into the chosen communication ports.
4.
Repeat the procedure for every communication cable you wish to install.
For details on the available ports, please re er to the "Port Des ription" se tion.
T e power supply of t e device must remain switc ed o
Failure to comply wit t ese instructions can lead to serious dama e to persons and
property, includin deat .
rom the right hand bo sheath
at the bottom o the
t rou
out t is p ase.
283

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the eProWallbox and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents