Free2Move eSolutions eProWallbox Installation Manual
Hide thumbs Also See for eProWallbox:

Advertisement

Quick Links

EN
Installation manual - Annex
A d v a n c e d f u n c t i o n a l i t i e s s e t u p

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the eProWallbox and is the answer not in the manual?

Questions and answers

Summary of Contents for Free2Move eSolutions eProWallbox

  • Page 1 Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS SECTION PAGE INTRODUCTION ............................3 DPM 2.0 ................................. 4 PROCEDURE ............................... 5 3. 1 Energy meter configuration........................7 3. 2 .................................. 8 DPM Pmax ...............................8 DPM ENABLING ............................9 LOAD UNBALANCE ..........................10 3. 3 Load unbalance enabling .......................... 11 Load unbalance current ..........................12...
  • Page 3: Introduction

    A d v a n c e d f u n c t i o n a l i t i e s s e t u p INTRODUCTION The following features on eProWallbox can be configured via Bluetooth. •...
  • Page 4 Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p DPM 2.0 INSTALLATION During the installation always refer to the meter installation manual included in the package.
  • Page 5: Procedure

    Set a filter (e.g. “ePro”) in order to see only eProWallboxes in the homepage Select Scan on the top right corner to identify the eProwallbox to be connected via Bluetooth through its Bluetooth name Once connected to the desired eProwallbox, select...
  • Page 6 Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p The Unknown Services contains all the parameters that can be written and read through Bluetooth The UUID is associated to a specific functionality By clicking on the down arrow the specifics...
  • Page 7 Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p Energy meter Configuration When powering up the Power Meter for the first time, tap&hold for 1.5 second, the central display button, at the bottom, until the display shows the page where to insert the password, initially set to 0000.
  • Page 8: Dpm

    Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p DPM PMAX Parameter: DPM_PMAX This field contains the contractual power expressed in Watt UUID: b4bc4914-1381-4294-acb0-776947becb9d TYPE: Uint32, select UINT32 on the app VALUE: min value 0, max value 70000...
  • Page 9: Dpm Enabling

    Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p DPM ENABLING Parameter: DPM_ENABLED This feature enable the DPM functionality UUID: 9b5732b1-b557-40f7-ab72-fb00a3696132 TYPE: Boolean, select BYTE on the app VALUE: 01 enabling, 00 disabling...
  • Page 10: Load Unbalance

    Installation manual - Annex A d v a n c e d f u n c t i o n a l i t i e s s e t u p LOAD UNBALANCE Load unbalance enabling Parameter: LOAD_UNBALANCE_ENABLED This function enables the load unbalance settings UUID: aa29e099-f9dc-40a4-8612-afbb78c612df TYPE: boolean, select BYTE on the app VALUE:...
  • Page 11 Registered office Free2move eSolutions S.p.A. Piazzale Lodi, 3 20137 Milan – Italy esolutions.free2move.com...

Table of Contents