2.8.1.
T ree p ase installation
In the case of three-phase installation, follow the steps below:
1.
oosen the le t hand bo sheath P and insert the
2.
ighten the bo sheath P
3.
Insert the power supply cables and connect phases, the neutral N and the earthing
cable PE to the CN1 power supply terminal block, making sure that the entire stripped
section of each cable is fully inserted into each terminal.
To con
ure t e maximum current p ase unbalance, enable t e load unbalance
function t rou
countries:
• Germany
• Austria
• Swit erland
For furt er details, c eck t e dedicated manual on eSolutions website
www.esolutions.free2move.com/document-library/
t e Modbus Map. T is con
mm corrugated sheath
uration is mandatory in t e followin
281
Need help?
Do you have a question about the eProWallbox and is the answer not in the manual?