TABLE OF CONTENTS SECTION PAGE INTRODUCTION GENERAL INFORMATION 1.1. Fields of use 1.2. Symbol and de nitions 1.3. Identi ation label 1.4. Produ t dimensions and hara teristi s 1.5. Te hni al spe i ations INSTALLATION 2.1. Preparing or Installation 2.2.
Page 3
TABLE OF CONTENTS SECTION PAGE 2.12. Shunt trip installation (optional) 2.13. Closing operations and power supply TROUBLESHOOTING MAINTENANCE PRODUCT DISPOSAL ASSISTANCE DISCLAIMER...
Free2move eSolutions S.p.A. is not responsible or any disposal o the e uipment, or parts thereo , that does not omply with the regulations and laws in or e in the ountry o installation.
Page 5
This do ument has been are ully he ked by Free2move eSolutions S.p.A. but oversights annot be ompletely ruled out. I any errors are noted, please in orm Free2move eSolutions S.p.A. Ex ept or expli it ontra tual obligations, under no ir umstan es may Free2move eSolutions S.p.A. be held liable or any loss or damage resulting rom use o this manual, or rom installation o the e uipment.
Page 6
Be ore installing eProWallbox, ensure the main power source has been disconnected. Be ore putting ba k or moving eProWallbox, ensure the devi e is not connected to the power supply. eProWallbox must only be used or the s eci c a lications it is designed or.
1.1. Fields of use Free2move eSolutions S.p.A. de lines all liability or any damage whatsoever due to in orre t or areless a tions. The e uipment may not be used or any purpose other than the one it is intended to ul l.
Sign or ele tri al voltage hazard Ele troni devi e installation arried out by uali ed personnel only This symbol indi ates a situation that may ause material damage to eProWallbox...
Page 9
1.3. Identi cation label The in ormation on the label is shown in the Figure below. The details may di er rom those shown in the Figure, depending on the version o the produ t. The Part Number and Serial Number an also be ound on the pa kaging as well as in the eSolutions Charging app a ter...
Page 10
1.4. Product dimensions and characteristics Cover Base Middle Base External Cover...
Page 11
1.5. Tec nical speci cations Description Charging Mode Mode 3 - ase B Conne tor Standard Type 2 Conne tor eatures So ket with lid and internal shutter Marking CE, UKCA General Specs Dimensions 403x336x190mm Weight ~ 3,8 kg Prote tion degree IP55 Impa t prote tion rating IK08...
Please read t is manual carefully before installin , switc in on and usin t e product. Free2move eSolutions S.p.A. recommends only usin experienced professionals w o comply wit current re ulations to install t e product correctly.
Page 13
Be ore pro eeding with the installation, make sure that: Input power is ompletely swit hed o , and remains so until installation is omplete The work area is ade uately ordoned o (a ess by persons not involved in the work must ...
Drill and 10mm diameter bit Do not use electrical screwdriver to assemble t e wallbox or to x it to t e wall. Free2move eSolutions S.p.A. declines any liability for dama e to persons or t in s arisin from use of suc tools.
2.5. First openin Using the groove on the bottom, deta h the external over o eProWallbox rom the housing, se ured with 6 elasti plugs. To pro eed with the installation, the over an be removed by uns rewing 6 s rews.
T e national and international buildin re ulations set out in IEC 60364-1 and IEC 60364-5-52 must be respected w en xin eProWallbox to t e wall. Correct positionin of t e c ar in station is important to ensure it functions properly.
IEC 61851-1 standard, the devi e must be prote ted upstream by externally installing a Miniature Cir uit Breaker (MCB) and a Residual urrent devi e (RCD). eProWallbox is not tted with a PEN ault dete tion system. MCB: Re ommended C urve, 5kA rated short- ir uit apa ity.
2.8. Power supply connection The e uipment must be powered by ables o an appropriate size and whi h are apable o withstanding the urrent or whi h the produ t has been designed. Make sure the ables are o a suitable size be ore wiring, and that the maximum permissible bending radius is not ex eeded.
Page 20
The lower part o the devi e body has 2 side able entries whi h are losed with prote tive aps to prevent dust or moisture rom entering during shipment. Power supply cables (P) Communication cables (C) Power supply cables (P) Communication cables (C)
Page 21
The ollowing diagram shows how to ele tri ally onne t the devi e in three-phase or single-phase systems. In the event o multiple installations, we re ommend allowing or phase rotation.
Page 22
2.8.1. T ree p ase installation In the case of three-phase installation, follow the steps below: oosen the le t hand bo sheath P and insert the mm corrugated sheath ighten the bo sheath P Insert the power supply cables and connect phases, the neutral N and the earthing cable PE to the CN1 power supply terminal block, making sure that the entire stripped section of each cable is fully inserted into each terminal.
Page 23
2.8.2. Sin le p ase installation In the case of single-phase installation, follow the steps below: oosen the le t hand bo sheath P and insert the mm corrugated sheath ighten the bo sheath P Insert the power supply cables and connect phase, neutral N and earthing cable PE to the CN1 power supply terminal block, making sure that the entire stripped section of each cable is fully inserted into each terminal.
Page 24
2.9. Connectin communication cables eProWallbox is e uipped with the ollowing ommuni ation eatures: 1. 2x RS485 2. RFID 3. BLE 4. Wi-Fi 5. 4G/LTE To onne t external devi es to the wallbox through the RS485 ommuni ation ports, su h as MID...
Page 25
2.10. Port description The ollowing table summarizes the ports available on eProWallbox: RFID reader RS485 x1 DPM Rotary Switc RS485 x1 DC S unt Trip DIP switch DIP switc Power Cable input Type Port Port code Scope Input Terminals or power ables...
Page 26
To install eProWallbox in IT systems, remove the plasti lm rom the DIP Swit h SW2 and move both onta ts to the ON position. DIP switc SW2...
2.11. Setting the rotary selector It is mandatory during the installation phase to set the re uired type o input power supply (single phase or three phase) and maximum power, a ording to the maximum power that an be supplied by the network, as per the ollowing table. After c an in t e position of t e Rotary Switc , restart t e wallbox via app to make t e c an es e ective.
Page 28
AC normally open onta t (CN3). To ensure orre t sele tion o the shunt trip devi e, it is ne essary to bear in mind that the onta t on the eProWallbox has the ollowing hara teristi s: rated 3A 250V, programmed to ommand a Shunt devi e in a ordan e with IEC 61851-1 standard.
Page 29
TROUBLESHOOTING I an error o urs with a harging session in progress, this will be interrupted and the so ket will be unlo ked to allow you to dis onne t the plug. The ollowing table provides a list o errors that an o our with the troubleshooting. I the error persists, please onta t Customer Servi e providing the wallbox serial number on the produ t label to re eive urther in ormation.
Page 30
Be ore arrying out any maintenan e work, power o the devi e and dis onne t it rom the ele tri vehi le. Only uali ed personnel an open the eProWallbox and per orm operations on the omponents. eProWallbox does not contain components t at t e user can repair or maintain autonomously.
Page 31
Further in ormation about urrent disposal a ilities an be obtained rom lo al authorities. ASSISTANCE I you have any uestions about the installation o eProWallbox, please onta t your lo al authorised assistan e entre through the appropriate Customer Support se tion at www.esolutions.free2move.com/contacts.
Need help?
Do you have a question about the eProWallbox and is the answer not in the manual?
Questions and answers