2.8.2.
Sin le p ase installation
In the case of single-phase installation, follow the steps below:
1.
oosen the le t hand bo sheath P and insert the
2.
ighten the bo sheath P
3.
Insert the power supply cables and connect phase, neutral N and earthing cable PE to
the CN1 power supply terminal block, making sure that the entire stripped section of
each cable is fully inserted into each terminal.
mm corrugated sheath
282
Need help?
Do you have a question about the eProWallbox and is the answer not in the manual?