Checking the lightning protection system
9 2
9 2 1
Note!
9 2 2
64 | DE

Carrying out a continuity and insulation test

Carrying out a continuity test

A continuity test of the isCon conductor at the separation points must be
carried out according to DIN VDE 0185-305-3.
Fig 67:
Carrying out a continuity test
W ith meshed systems, the test sequence must be carried out at each
separation point.
1. Open the separation point
earthing system from each other.
2. Using an ohmmeter, check the resistance value between the connec-
tion element
2
and the opened earthing system
3. If there is no continuity, then troubleshooting must be commenced.

Carrying out an insulation test

When using the Pro+ and Premium isCon conductors, ASE connection
elements can be used to check the cable insulation. This allows the
detection of items passing through the cable or mechanical penetrations,
e.g. by nails or screws.
isCon ASE 23
Art.-Nr.
xxxx xxx
Seriennr.
(fortl.)
U
_ _
< 0.5 kV
W DC
U
> 1.0 kV
_ _
S DC
OBO Bettermann
P.O.Bo
x 1120
D-58694 Menden
Germany
TESTING AREA
1
3
1
, in order to separate the conductor and
2
3
.