Used With The Ups2000-H-6/10Krtl-L (With A Bbb Box); Installing Communications Cables - Huawei SmartLi-ESM-24020P1 Quick Manual

Table of Contents

Advertisement

SmartLi-ESM-24020P1
Quick Guide

1.5.2 Used with the UPS2000-H-6/10KRTL-L (with a BBB Box)

1.5.2.1 Installing Communications Cables

Step 1 Install a communications cable between the battery module and the UPS.
Figure 1-34 Installing a communications cable between the battery module and
the UPS
(1) UPS
Step 2 If multiple battery modules are cascaded in a string, install parallel cables for the
battery modules.
Figure 1-35 Installing parallel cables between battery modules
Issue 03 (2022-12-30)
NO TE
The method of installing cables for the UPS2000-H-6KRTL-L is similar to that for the
UPS2000-H-10KRTL-L. The figures in this section use the UPS2000-H-6KRTL-L as an
example. The number and colors of cables in the figures are for reference only.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
(2) Battery module
27