Preparing Cables; Communications Cables - Huawei SmartLi-ESM-24020P1 Quick Manual

Table of Contents

Advertisement

SmartLi-ESM-24020P1
Quick Guide
Table 1-6 Engineering auxiliary materials
Labels
Insulation tape
Table 1-7 Other tools
Electrician's knife

1.2.2 Preparing Cables

1.2.2.1 Communications Cables

Cable Appearance
Issue 03 (2022-12-30)
Cable tie
Tweezer
Connector Type
● One end: port for connecting the
battery parallel cable
● The other end: port for connecting
the battery parallel cable
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Installation and Cable Connection
Cotton cloth
Brush
Remarks
Used to connect battery
modules. The BOM
number of the cable is
04080149 (1.5 m) or
04081025 (10 m). A
maximum of two 10 m
cables can be configured
and need to be
purchased separately.