Commissioning
7.3
Commissioning
Link the device to the voltage supply:
1
Connect the device plug-in contact to the voltage supply.
2
Press "Auto" on the controller's operator panel.
Note!
The system pressure is automatically measured by the integrated pressure sensor.
•
During commissioning the Servitec Mini always measures the actual system pressure
and generates a message if the pressure is less than the target system pressure by
more than 0.3 bar.
•
If the system pressure is less than 0.5 bar, a low water error is triggered. Increase the
system pressure accordingly.
Note!
We recommend rechecking of the pressure maintenance target value (system pressure) 2
weeks after commissioning of the Servitec Mini and if necessary, replenishing of the
system.
7.4
Installation and commissioning certificate
Note!
The installation and commissioning certificate can be found at the end of the operating
manual.