Installation and connection

Before commissioning, the dishwasher must
be securely installed, and the water inlet
and drain hoses and the mains cable
correctly connected. Follow the instructions
in "Installation", "Water connection" and
"Electrical connection" as well as the
installation plan.

Procedure

The commissioning process follows a set
procedure which cannot be interrupted.
All settings, except for water connections,
can be retrospectively altered via the
 
Machine functions
 
Extended settings

Switching on

Press the  button.

Selecting a language

Commissioning starts with the selection of
the display language.
‫ﺔﻴﺑﺮﻌﻟﺍ‬
Language
dansk
Scroll to the language you want using the
 and  arrow buttons and select the
language by tapping on it.
,  
Settings
and
menus.
čeština
deutsch

WiFi setup

In the next step, you can connect your
dishwasher to the WiFi network.
Set up WiFi?
Network/WiFi
No
Select
No
if you do not want to integrate
the dishwasher into the WiFi network or
want to do it later.
Yes
If you select
, the next steps will guide
you through the process to set this up.
Please refer to "Further settings,
Networking/WiFi".

Setting the temperature units

°C
Temp. unit
-
°C
Temperature display in Celsius.
°F
-
Temperature display in Fahrenheit.
Tap to select the option you want.

Commissioning