Commissioning; Installation And Connection; Procedure - Miele PG 8504 Operating Instructions Manual

Laboratory glassware washer for laboratory glassware and utensils
Table of Contents

Advertisement

Commissioning

Turning on the
machine
Selecting the
language
Selecting the
temperature unit
24

Installation and connection

Before commissioning, the machine must be securely installed, and
the water inlet and drain hoses and the power cord correctly con-
nected. See "Installation," "Water connection," and "Electrical con-
nection" and the installation plan supplied.

Procedure

During commissioning, a set procedure is followed which must not be
interrupted, e.g. by opening the door. The display will automatically
guide you through the process.
All settings, except for selecting the water connections, can be retro-
spectively altered via the
The settings made during the commissioning process are only
adopted after a complete program has been run.
If the program is interrupted or if no program is started or the ma-
chine is switched off, the commissioning process must be carried
out again.
Press the  button until the LED on the keypad lights up.
The commissioning process starts with selecting the language.
Use the  and  arrow buttons to select the language you want
and hit OK to save.
The menu for selecting the temperature unit will then appear.
Use the  and  arrow buttons to select the temperature unit you
want and hit OK to save.
Settings 
and
Additional settings
Language 
deutsch
(
english (GB)
Temperature unit
°C
°F
menus.

Advertisement

Table of Contents
loading

Table of Contents