Unpacking And Preparation - Demtech Pro-Wedge 3XL Operator's Manual

Geo-membrane wedge welder
Hide thumbs Also See for Pro-Wedge 3XL:
Table of Contents

Advertisement

Rev A: May 2010
5.1.

Unpacking and Preparation

a. Before opening the shipping/storage case for the first time and unpacking the welder,
inspect the outside of the case thoroughly for any signs of mishandling or damage during
shipping. Report any damage to the shipping carrier immediately and do not proceed
with unpacking. You should consult your administration concerning claims for shipping
damage.
Please notify DEMTECH Services, Inc. or your authorized DEMTECH
distributor where the product was purchased in the event of any shipping damage.
b. Unlatch and open the shipping/storage case lid and inspect inside the case and equipment
thoroughly for any signs of mishandling or damage during shipping. Report any damage
to the shipping carrier immediately and do not proceed with unpacking. You should
consult your administration concerning claims for shipping damage.
DEMTECH Services, Inc. or your authorized DEMTECH distributor where the product
was purchased in the event of any shipping damage.
c. Make note of the orientation of the equipment and packing foam inserts inside the
shipping case to facilitate any repackaging requirements in the future.
d. To avoid injury and/or damage to the welder, be sure to use adequate care when lifting,
removing or replacing the welder into the shipping/storage case.
e. The welder must be removed from the shipping/storage case and placed in an appropriate
location suitable for the welding you intend to perform.
Page 5
Pro-Wedge 3XL Operator's Manual
Please notify
Pro-Wedge 3XL Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

500-0100/3xl/a

Table of Contents