Routine Maintenance - Goodwe ET Series User Manual

Hybrid inverter 5.0-10.0kw ac-coupled inverter 5.0-10.0kw
Hide thumbs Also See for ET Series:
Table of Contents

Advertisement

09 Maintenance

9.5 Routine Maintenance

Maintaining Item
System Clean
DC Switch
Electrical Connection
Sealing
Maintaining Method
Check the heat sink, air intake, and air
outlet for foreign matter or dust.
Turn the DC switch on and off ten
consecutive times to make sure that it is
working properly.
Check whether the cables are securely
connected. Check whether the cables are
broken or whether there is any exposed
copper core.
Check whether all the terminals and ports
are properly sealed. Reseal the cable hole
if it is not sealed or too big.
User Manual V1.1-2022-12-20
60
Maintaining Period
Once 6-12 months
Once a year
Once 6-12 months
Once a year

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents