The BT series inverter of Jiangsu GoodWe Power Supply Technology Co., Ltd. (hereinafter GoodWe BT series bidirectional inverter is designed for both indoor and outdoor use, which could called as GoodWe) strictly complies with related safety rules for product design and testing.
1.3 Product Overview Safety warning Any installation and operation on inverter must be performed by qualified electricians, in compli- ance with standards, wiring rules or requirements of local grid authorities or companies (like AS 4777 and AS/NZS 3000 in Australia). Prohibit inserting and pulling the AC and DC terminals when the inverter is running.
Smart Meter Positive & Negative Front ------------- 300mm Inverter AC Cover Pin Terminal Bracket With 3 CT Both sides -------- 200mm 500mm BT SERIES USER MANUAL AC-COUPLED BATTERY STORAGE RETORFIT Quick Installation PE Terminal Pin Terminal Fixed Screw User Manual Instructions...
2.3.2 Mounting Step 3 Inverter cannot be installed near flammable, explosive or strong electro-magnetic Ground cable shall be connected to the ground plate on grid side. equipment. The inverter is suitable for mounting on concrete or other non-combustible surface only. Step 1 Please use the mounting bracket as a template to drill 4 holes in the right positions (10mm in diameter,and 80mm in depth)
2.4 Electrical Wiring Connection Step 3 2.4.1 Battery Wiring Connection Screw the cap on and plug it onto inverter side. : There will be a click sound if connectors are inserted correctly into BAT plugs. Note Please be careful about any electric shock or chemical hazard. For battery without build-in DC breaker, make sure there is an external DC breaker (≥40A) connected.
Page 8
Declaration for back-up function The back-up output of BT hybrid inverters have over load ability. For details please refer to the technical parameters of BT series inverter(4.3 se) And the inverter has self-protection derating at high ambient temperature. The below statement lays out general policies governing the energy storage inverters of the series EH, EM, ES, ET, BH, BT and SBP.
Accepted loads as below: Smart Meter & CT connection diagram • Inductive load: 1.5P non-frequency conversion air-conditioner can be connect to back-up side. Two or more non-frequency conversion air-conditioner connect to back-up side may cause UPS mode to be unstable. •...
2.6 Earth Fault Alarm Connection Note: DRED should be connected BT series inverter complies with IEC 62109-2 13.9. Fault indicator LED on the inverter cover will through "DRED Port" as the light up and the system will email the fault information to customer.
Page 11
Wiring system for BT series hybrid inverter System connection diagrams Note: This diagram indicates wiring structure of BT series AC coupled inverter, not the Note: According to Australian safety regulation, the neutral cable of on-grid side and electric wiring standard.
Channel If you still neet to configure the other pages of information, WiFi_Burn-in WPAPSKWPA2PSK/TKIPAES Back-Up Switch please go to complete your required configuration. Please download "PV Master App" from www.goodwe.com or scan WiFi_Burn-in WPAPSKWPA2PSK/TKIPAES Anti-Reverse Function Switch Off WiFi_Burn-in WPAPSKWPA2PSK/TKIPAES Configuration is completed, you can log on the Management...
OTHERS 4.1 Error Messages The error messages below will be displayed on PV Master App or reported by e-mail if the error occurs. ERROR MESSAGE EXPLANATION REASON SOLUTIONS Utility Phase Failure The sequence of on-grid wire is wrong Inverter detects that phase angle of L2 and L3 are reversed Reverse connection order of L2 and L3 cable.
4.2 Troubleshootings Problems During Operation Checking Before Turning On AC Power BT does not start up with only battery • Battery connection: Confirm the connection between BT and battery : polarities (+/-) are not Solution: reversed, refer to Figure 4.2-1 Make sure the voltage of battery is higher than 180V, otherwise battery cannot start BT up.
Page 15
Meter cannot communicate. Also any manual setting change could cause Meter commu- nication failure. A: For BT series inverter, it could connect lithium batteries which have compatibility with BT series inverter with nominal voltage from 180V to 600V. For compatible lithium batteries please refer to battery list in PV Master App.
4.3 Disclaimer 4.4 Technical Parameters The BT series inverters are transported, used and operated under environmental and electrical Technical Data GW5K-BT GW6K-BT GW8K-BT GW10K-BT conditions. Manufacturer has the right not to provide after-sales services or assistance under Battery Input Data...
4.5 Other Test Technical Data GW5K-BT GW6K-BT GW8K-BT GW10K-BT For Australian requirements, in the THDi test, Zref should be added between inverter and mains. General Data RA, XA for Line conduvtor Operating Temperature Range (℃) RN, XN for Neutral conductor Relative Humidity Zref: Operating Altitude (m)...
Page 18
Moisture location category definition Level Moisture Parameters 4K4H Temperature Range 0~+40℃ -33~+40℃ ~20~+55℃ Moisture Parameters 5%~85% 15%~100% 4%~100% Environment category definition Environment Condition Ambient Termperature Relative Humidity Applied to Outdoor -20~50℃ 4%~100% Indoor Unconditioned -20~50℃ 5%~95% Indoor conditioned 0~40℃ 5%~85% Pollution degree definition No pollution or only dry, non-conductive polllution occurs.