9.3 Checklist before commissioning

Checklist before commissioning

Installation space is according manual (above average snow height/ enough clearances)
Outdoor unit is installed
Product is protected against direct wind on fan/ snow ingress
In case the product is installed close to sea, additional protection (coating) is applied
Outdoor unit is correctly secured to base
Provisions for condensate/ drainage are made, without any risk of freezing (tracing heating)
All external pipework is insulated
Power supply is installed with a dedicated correctly rated ELCB and correct cable sizing
Voltage between (*optional: in case of 3PH)
Voltage between (*optional: in case of 3PH)
Voltage between
Power supply is fitted with an isolator within in reach (arm length)
ELCB fuse rating (Amps)
Mains power supply cable size (mm2)
Communication cable size (mm2)
Communication cable shielded, single sided connected to PE
Additional refrigerant charge, split type (kg) (R32)
Total charge (kg) (R32)
Outdoor unit channel address setting (default is 00)
Outdoor unit noise restriction setting
Installer reference guide / Mono tank integrated type
Outdoor unit
higher
/ same level
/ lower
L1 - N
V~
L1 - N
V~
No (default)
-3dB
Yes
, than the indoor unit.
Yes
Yes
Yes
Yes
Yes
Yes
L2 - N*
V~
L3 - N*
L2 - N*
V~
L3 - N*
N - PE
Yes
Yes
kg
kg
-5dB
-7dB
max.35dB
No
No
No
No
No
No
No
V~
V~
V~
No
A
mm2
mm2
No
R
R
173

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents