Installing The Cable-Management Arm For The San Volume Controller 2145-Cf8; Installing The Rear Of A San Volume Controller 2145-Cf8 Slide Rail In The Rear Of The Rack; Installing The Front Of A San Volume Controller 2145-Cf8 Slide Rail In The Front Of The Rack - IBM 2145-CF8 Hardware Installation Manual

Table of Contents

Advertisement

Figure 22. Installing the rear of a SAN Volume Controller 2145-CF8 slide rail in the rear of
the rack
4. Install the front of the rail into the front of the rack.
Figure 23. Installing the front of a SAN Volume Controller 2145-CF8 slide rail in the front of
the rack
5. Install the other rail in the same manner.
Installing the cable-management arm for the SAN Volume
Controller 2145-CF8
The SAN Volume Controller 2145-CF8 uses a cable-management arm to route and
secure power and communication cables.
The parts involved in installing the cable-management arm are shown in Figure 20
on page 24.
Install the cable-management arm to pivot from the left side of the SAN Volume
Controller 2145-CF8 rack, when viewed from the rear of the rack.
To attach the arm, perform the following steps:
1. Pull the node slightly out of the rack to provide space for working on the
26
IBM System Storage SAN Volume Controller: Model 2145-CF8 Hardware Installation Guide
a. Pull the slide rail forward.
b. Insert the two pins on the front of the rail, as shown by 1 in Figure 23,
into the two lower holes in the U on the front of the rack.
c. Drop the rail into place until it clicks.
d. Push the front latch 2 in all the way.
cable-management arm at the rear of the rack.

Advertisement

Table of Contents
loading

Table of Contents