The 2145 Ups-1U Internal Battery Connector With Protective Tape; The 2145 Ups-1U Internal-Battery Connector - IBM 2145-CF8 Hardware Installation Manual

Table of Contents

Advertisement

Figure 14. The 2145 UPS-1U internal battery connector with protective tape
5. Connect the internal battery connector (shown in Figure 15). Each end of the
Figure 15. The 2145 UPS-1U internal-battery connector
6. Reinstall the front panel. You might first need to move the sliding section on
7. At the back of the 2145 UPS-1U, plug the 2145 UPS-1U main-power connector
20
IBM System Storage SAN Volume Controller: Model 2145-CF8 Hardware Installation Guide
keyed connector has two wires: one red (+) and one black (−). Align the
connector so that the two red wires are joined together and the two black wires
are joined together.
Note: A small amount of arcing might occur when connecting the batteries.
This is normal and does not damage the unit or present any safety
concerns.
the front of the 2145 UPS-1U to the closed position.
into the power socket.
The power socket is shown by 1 in Figure 16 on page 21.
The 2145 UPS-1U is in standby mode; so all indicators are off.
Connect each 2145 UPS-1U for an I/O group to a different power source.

Advertisement

Table of Contents
loading

Table of Contents