IBM 2145-CF8 Hardware Installation Manual page 95

Table of Contents

Advertisement

planning for SAN Volume Controller
installation 41
ports
Ethernet 53
SAN Volume Controller 2145-CF8 53
power
button 50
cables
2145 UPS-1U 45
country or region 45
distribution unit (PDU) 45
requirements
SAN Volume Controller
2145-CF8 41
site, connecting to 14
power LED 50
power-supply error LED 52
preparing
physical configuration 7
physical environment 7
uninterruptible power supply
environment 44
R
Read Me First pamphlet 18
rear-panel indicators
SAN Volume Controller 2145-CF8 51
redundant ac power switch
cabling 2
danger notices 11
examples 2
installing
attaching the mounting plates 12
steps 11
redundant ac-power switch
cables 13
connecting 13
input-power cables 13
to the site power 14
environment preparation 43
installing
in the rack 13
labeling the cables 13
testing 15
mounting 13
overview 2
power cables 45
specifications 43
related information xvi
replacing
cable-management arm
SAN Volume Controller
2145-CF8 26
requirements
2145 UPS-1U 4
ac voltage 41, 42
circuit breakers 41
electrical 41
power 41
power cables 45
redundant ac-power switch 45
SAN Volume Controller 2145-CF8 41
retention bracket
SAN Volume Controller 2145-CF8 33
S
safety notices ix
SAN (storage area network)
connecting to 34
SAN Volume Controller
checking grounding xi
features 1
hardware 1
hardware components 47
installation guidelines 23
installing
overview xxi
minimum requirements 1
node, components 7
overview 1
physical configuration 7
planning tables and charts 7
software
overview 1
SAN Volume Controller 2145-8G4
cable retention brackets 33
SAN Volume Controller 2145-CF8
additional space requirements 43
air temperature without redundant ac
power 42
cable-management arm 26
circuit breaker requirements 41
connecting
ethernet 34
to a SAN 34
to the 2145 UPS-1U 31
connectors 53
controls and indicators on the front
panel 47
dimensions and weight 43
fibre-channel
LEDs 51
port number 55
heat output of node 43
humidity with redundant ac
power 42
humidity without redundant ac
power 42
indicators and controls on the front
panel 47
indicators on the rear panel
fibre-channel LEDs 51
input-voltage requirements 41
installation, verifying 35
installing in a rack 30
LEDs
fibre-channel 51
power, location, and
system-error 52
nodes
heat output 43
operator-information panel 48
release latch 49
ports 53
power requirements for each
node 41
power, location, and system-error
LEDs 52
product characteristics 41
rear-panel indicators 51
release latch 49
requirements 41
SAN Volume Controller 2145-CF8
(continued)
service ports 54
specifications 41
support rails 23
temperature with redundant ac
power 42
unused ports 54
weight and dimensions 43
SAN Volume Controller 2145-CF8 node
features 1
SAN Volume Controller library
related publications xvi
service ports
SAN Volume Controller 2145-CF8 54
shortcut keys 39
site power
redundant ac-power switch
connecting 14
testing 15
uninterruptible power supply
testing 15
sockets
output power 12
software
overview 1
space requirements
SAN Volume Controller 2145-CF8 43
specifications
redundant ac-power switch 43
static-sensitive devices xiii
status
2145 UPS-1U 4
support rails
2145 UPS-1U 16
SAN Volume Controller 2145-CF8 23
switches
redundant ac power 2
system-error LED 49
T
tables and charts, planning 7
Taiwan
contact information 65
electronic emission notice 64
test and alarm-reset button 58
testing redundant ac-power switch 15
trademarks 61
U
uninterruptible power supply
2145 UPS-1U
configuration 4
controls and indicators 55
environment 44
overview 4
power cables 45
checking grounding xi
configuration 4
overview 4
preparing environment 44
preparing for installation 7
United Kingdom electronic emission
notice 64
69
Index

Advertisement

Table of Contents
loading

Table of Contents