After reaching the location requiring the elbow, proceed as follows:
1. Install the first elbow; turn it in the required direction. Secure it to the chimney according to the
chimney manufacturer's instructions. In many cases, it is recommended to secure connections with
three (3) ½" (12 mm) metal screws.
2. Install the necessary chimney lengths to achieve the required offset. Lock the chimney lengths together
according to the chimney manufacturer's instructions. In many cases, it is recommended to use three
(3) ½" (12 mm) screws. If the offset length is made of two (2) chimney lengths or more, many chimney
manufacturers may require that you use an offset or roof support halfway up the offset. If penetrating
a wall, install a wall radiation shield supplied by the chimney manufacturer.
3. Use another elbow to turn the chimney vertically. Secure the elbow.
4. Use a plumb bob to line up the centre of the hole. Cut a hole for the chimney in the ceiling/floor. Frame
this hole as described previously.
5. From below, install a firestop supplied by the chimney manufacturer (see preceding figure).
6. A support must be used on the first 15' section (4.6 m).
7. Continue with the regular installation.
54 __________________________________________________________________________
Fireplace model
Chimney model
Vertical installation
Two (2) elbows
Four (4) elbows
STRATFORD
All models (see Table 2)
15 ft. (4.6 m)
15 ft. (4.6 m)
17 ft. (5.2 m)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stratford

Table of Contents