Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Projector Spigot mounted FLC301 FLC311 FLC321 Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance Refer to the instructions contained with applicable standards.
Page 2
Projector Spigot mounted FLC301 FLC311 FLC321 IP66, IK08. Class I. T a = 40°C Weight for FLC301 Spigot mounted for FLC311 Spigot mounted for FLC321 Spigot mounted...
In case of component failure due to abnormal circumstances or at end of life, replacement must be carried Warning: Do not open luminaire while mains supply is switched on. Mounting Accessories Ground spike SF-FLC1 for FLC301 Spigot mounted 145-9535 EF1 for FLC301 Spigot mounted 310-9102...
Installation The product must be installed and maintained by a with latest building/construction and/or electrical regulations and relevant legislation. Warning: Notice: will no longer be valid and shall become the full responsibility of the modifying person/organisation. Claims based on defects attributable to improper installation and/or application, and the consequences thereof, are excluded.
Installation Procedure 2) Check that rating shown on luminaire label conforms with mains electrical supply. 10/20 IP66 FLC301-LED 220-240V50-60Hz 145-XXXX SOE XXXXXXX LED 3000K 4W item no. XXX (example) 3) Loosen screw A. 4) Place luminaire on one of the following mounting accessories.
Page 6
feed cable B from luminaire C through pivot G feed cable B from luminaire C through pivot, and cable gland D E. Slide cable entry G and cable gland D of column F over pivot. F over pivot. Ground spike Junction box 4.3) Feed cable B from luminaire C through 4.4) Feed cable B from luminaire C through...
Page 7
8) For accessory Linear Spread Lens IO-180: respective terminals in terminal connector C: Turn frame O to set desired orientation of light. For FLC301 a) ON-OFF (L = Phase, N = Neutral, = Earthing) b) ON/OFF 24VDC (+ = positive pole,...
Page 9
WE-EF LEUCHTEN Installation and Maintenance Instructions Accessories Ground Spike Junction box Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance Refer to the instructions contained with applicable standards. in this document for details.
Page 11
Installation The product must be installed and maintained by a building/construction and/or electrical regulations and relevant legislation. Warning: Notice: will no longer be valid and shall become the full responsibility of the modifying person/organisation. Claims based on defects attributable to improper installation and/or application, and the consequences thereof, are excluded.
Page 12
Installation Procedure 1) Feed cable from luminaire through pivot Drill relevant holes E and insert nylon plugs R. Insert and tighten screws D. After installation of luminaire, tighten cable gland. Warning: Ensure not to damage any electrical cable, water pipe or other items drilling holes.
Page 13
Ground Spike 1) Note: It is the responsibility to installer to 2) Place ground spike H into the ground. ensure the suitability of the ground spike for 3) Feed cable from luminaire through pivot and cable gland I. After installation of luminaire, tighten cable gland I.
Page 14
Junction box 1) Loosen screws K and remove cover L from 2) Feed main supply cable R through wall entry body M. or side entry of body M. For side entry installations, replace the pre-installed plugs with provided cable glands as required.
Page 15
5) After installation of luminaire, place cover L on body M and tighten screws K.
Need help?
Do you have a question about the FLC301 and is the answer not in the manual?
Questions and answers