Chapter 3: Getting Started - Labconco Protector XL 1124 Series User Manual

Floor-mounted (walk-in) laboratory fume hood
Table of Contents

Advertisement

Original instructions
C
HAPTER
G
ETTING
Now that the site for your floor-mounted fume hood is properly prepared, you are
ready to unpack, inspect, install, and certify your unit. Read this chapter to learn
how to:
 Unpack and move your floor-mounted hood.
 Set up the floor-mounted fume hood on the floor.
 Connect to an exhaust system.
 Connect the electrical supply source.
 Connect the service lines.
 Sealing the Protector Hood to the floor.
 Arrange certification of your Protector Hood.
Depending upon which model you are installing, you may need common
plumbing and electrical installation tools in addition to 5/16", 3/8", 7/16", and
1/2" wrenches, ratchets, sockets, a nut driver set, a flat-blade screwdriver, a
Phillips screwdriver, and a carpenter level to complete the instructions in the
chapter.
!
Product Service 1-800-522-7658
3
S
TARTED
The Protector XL Hood models weigh between 700 to 3500 lbs.
(318-1593 kg). The multiple shipping pallets allow for lifting
with a mechanical lift truck or floor jack. If you must lift the
fume hood manually, follow safe-lifting guidelines.
Les modèles Protector XL capot pèsent entre 700 à 3500 livres.
(318-1593 kg). Les multiples palettes d'expédition permettent
de levage avec un chariot élévateur mécanique ou prise de
parole. Si vous devez soulever la hotte manuellement, suivre les
directives safe-levage.
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Protector XL 1124 Series and is the answer not in the manual?

Table of Contents