Connecting The Cp Application Module Electrically To Basic Module Cp Lab Conveyor - Festo CP Factory Original Operating Instructions

Hide thumbs Also See for CP Factory:
Table of Contents

Advertisement

Commissioning

7.4.2 Connecting the CP application module electrically to basic module CP Lab Conveyor

SysLink-interface for digital signals
The CP application module exchanges digital input and output signals with the basic module via the
SysLink interface:
Connect the I/O terminal (3) of the CP application module with the control (1) of the basic module
CP Lab Conveyor. Therefore use the connecting cable with SysLink plugs (5) which has already been
attached to the control and is led out on the back side of the basic module CP Lab Conveyor.
Electrical connections / illustration similar
Position
Description
1
connecting cable with15-pin standard D-Sub-plugs
2
basic module CP Lab Conveyor: control or decentralized periphery
3
CP application module: I/O terminal (+BG-XD1)
4
CP application module: analogue terminal (+BG-XD2A)
5
connecting cable with a SysLink-plug (SysLink-cable)
6
basic module CP Lab Conveyor: board at the back (+G1-XZ2)
48
With special variants of the basic module CP Lab Conveyor, you absolutely have to
observe the corresponding operation instructions of the basic module CP Lab Conveyor!
NOTE
© Festo Didactic
8065842 en

Advertisement

Table of Contents
loading

Table of Contents