Overhaul (Parts Replacement) - Epson RS Series Maintenance Manual

Industrial robot: scara robot
Hide thumbs Also See for RS Series:
Table of Contents

Advertisement

RS3 RS4 Maintenance 2. General Maintenance

2.2 Overhaul (Parts Replacement)

■ If you do not overhaul properly, it may have a serious impact on safety.
■ Overhaul timing is based on an assumption that all joints are operated for equal
distance. If a particular joint has a high duty or high load, it is recommended to
CAUTION
overhaul all joints (as many as possible) before exceeding 20,000 operation hours
with the joint as a basis.
The parts for the manipulator joints may cause accuracy decline or malfunction due to
deterioration of the manipulator resulting from long term use.
manipulator for a long term, it is recommended to overhaul the parts (parts replacement).
The time between overhauls is 20,000 operation hours of the Manipulator as a rough
indication.
However, it may vary depending on ambient temperature, usage condition and degree of the
load (such as when operated with the maximum motion speed and maximum acceleration /
deceleration in continuous operation) applied on the Manipulator.
NOTE
For the EPSON RC+ 7.0 Ver. 7.2.x or later (firmware Ver.7.2.x.x or later), the
recommended replacement time for the parts subject to maintenance (motors, reduction
gear units, and timing belts) can be checked in the [Maintenance] dialog box of the
EPSON RC+ 7.0.
For details, refer to the following manual.
RC700 series Maintenance Manual 6. Alarm
Note:
The recommended replacement time for the maintenance parts is when it reaches the L10
life (time until 10% failure probability). In the [Maintenance] dialog box, the L10 life is
displayed as 100%.
6
In order to use the
RS series Maintenance Rev.3

Advertisement

Table of Contents
loading

Table of Contents