Rigging Procedure: Splay Line Array

1. Set the bumper under the rigging position.
Set the shackle(s) in the proper pick-up hole positions
according to the loading configuration and tilting angle.
Single shackle lifting point
Holes for shackle(s): lifting points
1
2
3
4
5
6
7
pin holes for attaching the
top line array element
Never exceed the maximum weight limit
according to the load configuration.
KH2 I, KH2P I,
KS3 I, KS3P I
K-HCFLY2I
WEIGHT : 26.5 kg
MAX LOAD 775 kg (7:1)
MAX LOAD 1030 kg (7:1)
- Firenze ITALY
KH2 I
KH3 I
29 kg / 63.93 lb 43,6 kg / 96,12 lb 64 kg / 134.5 lb 56 kg / 123.4 lb 60 kg / 132.3 lb
KH2P I
KH3P I
24 kg / 53 lb
38,6 kg / 85 lb
Twin shackle lifting points
8
9
10
11
12
13
14
15
16
17
18
19
BOTTOM
KH3 I, KH3P I, KH5 I, KH5P I,
KS4 I, KS4P I
K-HCFLY35I
WEIGHT : 38 kg
MAX LOAD 960 kg (7:1)
MAX LOAD 1280 kg (7:1)
KH5 I
KS3 I
KH5P I
KS3P I
59 kg / 130 lb 49,2 kg / 108.5 lb 53,2 kg / 117.3 lb
The line array is usually down-tilted from a high position
over the listening area. The K-HCFLY2I and K-HCFLY35I
bumpers can be reversed fot up-tilting the line array.
FRONT
REAR
In orde to up-tilt the line array:
• take out the couple of quick-release pins and
accessories attached to the bumper;
TOP
• reverse the bumper;
• set the accessories as described in the following
pictures:
- Firenze ITALY
KS4 I
KS4P I
Mugello-KH I
Down-tilting line array
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Up-tilting line array
Up-tilting fly bar configuration
User Guide
REAR
17
18
19
FRONT
17