4.1.2 - Loading the implement
1. Connect the implement to the tractor as per section 6.1.1 connecting hydraulic services and as
per section 5.13. The implement can also be lifted using a 3 Point hitch frame and a telehandler.
2. Prepare the implement for loading by placing it into its transport position.
3. It is recommended that a banksman (Assistant) is used during this operation. Carefully load
the implement onto the machine by pushing backwards. The implement may need to be lifted/
lowered to avoid obstructions as it is loaded onto the transport vehicle.
4. Lower the implement fully into its transport position once the implement is in place on
the transport vehicle and should be lowered onto its storage legs. (Depending upon local
regulations the implement may need to be loaded onto the flatbed trailer unfolded (It is highly
recommended to use a 3 Point hitch and telehandler frame for this operation)
5. The implement should be secured using appropriate lashings to prevent movement during
transport operations
6. The tractor/Hitch frame can be unhitched from the implement and removed.
4.2 - Machine Transport
Country specific regulations regarding transport height and width must be adhered to for
transporting the implement on public roads. This applies whilst the tractor is connected to the
implement, or whilst it is being transported on a flatbed trailer. Some components may need to be
removed on the machine to comply with these transport regulations.
If transporting with a tractor it must be suitable and have sufficient steering and braking capacity
(With ballasting) for the implement – This is discussed in depth throughout chapter 3
If transporting on a low loader the equipment must be securely lashed with the appropriate
restraining devices.
4.3 - Machine Installation
Machine operation must only occur after the operator has read the operating instructions and the
machine is commissioned appropriately. Any parts removed for delivery/transportation purposes
must be refitted and appropriately checked.
26
|