Electrical Box - Daikin ATC25QRV16 Service Manual

Removal procedure
Table of Contents

Advertisement

Si041402EC

5. Electrical Box

Warning
Step
1
Remove the screw, and
then the service cover.
2
Remove the screw, and
then the wire fixture.
3
Remove the 4 screws
on the terminal board
and disconnect the
connecting wire.
4
Disconnect the 3
connectors.
5
Release the harnesses
from the hooks.
Removal Procedure
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Wire fixture
Service cover
(R20065)
Terminal board
Connecting wire
(R20066)
Hook
Hook
(R23417)
Electrical Box
Points
(a) fan motor:
[S1] or [CN_FAN]
(b) swing motor:
[S6] or [CN_STP]
(c) fan motor (Hall IC):
[S7] or [CN101]
(a)
(b)
(c)
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents