Introduction
Congratulations on your purchase of a Spectra-Physics system. This guide describes pre-
installation information for your laser system.
Some preliminary planning is essential to avoid unnecessary delays during installation and to ensure
easy operation and access to your system. You are requested to carefully consider your operating
environment prior to installation. Proper water, power and room temperature are required for each
system.
A checklist of pre-installation considerations is provided in this guide. You are responsible for
meeting these requirements prior to installation, with due consideration given to all applicable
building and safety codes.
We at Spectra-Physics intend to provide you with responsive support so that you can derive great
satisfaction and value in using our systems for your applications. We are available to you at 1-
800-456-2552.
©Newport Corporation
MKS Spectra-Physics Confidential
3 of 10
Need help?
Do you have a question about the Spectra-Physics Tsunami and is the answer not in the manual?